ITAC Assessment: CO0206
ITAC logo
ITAC Assessment: CO0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FABRICATED METAL
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,704 414,127
kWh
Natural Gas $23,575 5,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4323: Use optimum size and capacity equipment $900 $2,500 $900
11,723
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $561 $157 $561
7,327
kWh
-
03 2.7314: Reduce ventilation air $891 $2,000 $157
2,052
kWh
$734
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $600 $1,000 - $600
-
MMBtu
05 2.2514: Cover open tanks $823 $580 - $823
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $580 $200 $580
7,620
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $83 $242 $83
1,172
kWh
-
08 2.2511: Insulate bare equipment $226 $570 - $226
-
MMBtu
TOTAL RECOMMENDED $4,664 $7,249 $2,281
29,894
kWh
$2,383
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs