ITAC Assessment: CO0201
ITAC logo
ITAC Assessment: CO0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CERAMIC PRODUCTS
NAICS
n/a
SIC 3264: Porcelain Electrical Supplies
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $863,181 18,017,585
kWh
Natural Gas $935,922 274,445
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,700 $500 $1,700
35,463
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $3,300 $1,500 $3,300
145,955
kWh
-
03 2.4133: Use most efficient type of electric motors $3,350 $3,047 $3,350
69,754
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,665 $5,400 $4,665
97,304
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,665 $5,440 $4,665
97,304
kWh
-
06 2.1123: Install automatic stack damper $1,000 $1,000 - $1,000
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $230 $400 - $230
-
MMBtu
TOTAL RECOMMENDED $18,910 $17,287 $17,680
445,780
kWh
$1,230
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs