ITAC Assessment: CO0181
ITAC logo
ITAC Assessment: CO0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SCREWDRIVERS
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 34,500,000
pieces
Production Hrs. Annual 6,816
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,387 3,274,619
kWh
Natural Gas $40,964 10,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,558

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $25,900 $28,000 $25,900
-
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,300 $1,000 $3,300
76,202
kWh
-
03 2.4133: Use most efficient type of electric motors $850 $1,630 $850
19,343
kWh
-
04 2.8211: Consolidate freight shipments and/or deliveries $400 $2,000 $1,050
-
kWh
$(-650.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,825 $1,606 $1,825
41,618
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $583 $792 $583
13,189
kWh
-
TOTAL RECOMMENDED $32,858 $35,028 $33,508
150,352
kWh
$(-650.0)
TOTAL IMPLEMENTED $6,558 $5,028 $6,558
150,352
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs