ITAC Assessment: CO0174
ITAC logo
ITAC Assessment: CO0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PLATING & ANODIZING
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $500
k
to 1
M
# of Employees 20
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,496
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,373 432,884
kWh
Natural Gas $27,042 7,168
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $2,600 $2,900 $820
11,137
kWh
$1,780
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $760 $2,360 - $760
-
MMBtu
03 2.2514: Cover open tanks $761 $1,200 $166
2,345
kWh
$595
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,055 $1,000 - $1,055
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $175 $74 $175
2,345
kWh
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $380 $300 $380
-
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $22 $105 $22
293
kWh
-
TOTAL RECOMMENDED $5,753 $7,939 $1,563
16,120
kWh
$4,190
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs