ITAC Assessment: CO0163
ITAC logo
ITAC Assessment: CO0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product IRON & STEEL CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 1,500,000
lb
Production Hrs. Annual 3,474
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,521 2,010,844
kWh
Natural Gas $38,066 10,243
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,290

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $720 $700 - $720
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $480 $600 - $480
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $900 $500 $900
17,292
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $780 $200 $780
14,947
kWh
-
05 2.2437: Recover waste heat from equipment $570 $400 - $570
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $340 $130 $340
6,448
kWh
-
TOTAL RECOMMENDED $3,790 $2,530 $2,020
38,687
kWh
$1,770
-
MMBtu
TOTAL IMPLEMENTED $2,290 $1,630 $1,240
23,740
kWh
$1,050
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs