| Assessment Year | 1989 |
|---|---|
| Principal Product | METAL PLATING |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $500 k to 1M |
| # of Employees | 15 |
| Plant Area |
n/a
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 4,342
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $19,078 | 213,951 |
kWh
|
$0.089 |
| Natural Gas | $24,193 | 5,896 |
MMBtu
|
$4.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,461 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,789 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $2,800 | $3,320 | - |
$2,800
-
MMBtu
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,324 | $1,000 |
$1,793
20,223
kWh
|
$(-469.0)
-
MMBtu
|
|
| 03 | 2.8121: Apply for tax-free status for energy purchases | $1,160 | $250 |
$510
-
kWh
|
$650
-
MMBtu
|
|
| 04 | 2.1123: Install automatic stack damper | $990 | $500 | - |
$990
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $259 | $83 |
$259
2,931
kWh
|
- | |
| 06 | 2.2514: Cover open tanks | $505 | $220 |
$133
4,982
kWh
|
$372
-
MMBtu
|
|
| 07 | 2.2162: Reduce excess steam bleeding | $1,043 | $3,000 | - |
$1,043
-
MMBtu
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $230 | $100 |
$230
2,638
kWh
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $150 | $200 |
$150
1,758
kWh
|
- | |
| TOTAL RECOMMENDED | $8,461 | $8,673 |
$3,075
32,532
kWh
|
$5,386
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,789 | $1,133 |
$1,149
7,327
kWh
|
$1,640
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs