ITAC Assessment: CO0145
ITAC logo
ITAC Assessment: CO0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CLAY BRICKS
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $404,186 7,110,492
kWh
Natural Gas $733,795 377,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,905

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $11,700 $20,000 $(-1,400.0)
(-24,619)
kWh
$13,100
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,660 $2,330 $1,660
29,308
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $520 $100 $520
9,086
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $180 $70 $180
3,224
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,545 $2,000 $1,545
27,257
kWh
-
06 2.8114: Change rate schedules or other changes in utility service $41,900 $2,000 $41,900
-
kWh
-
TOTAL RECOMMENDED $57,505 $26,500 $44,405
44,256
kWh
$13,100
-
MMBtu
TOTAL IMPLEMENTED $3,905 $4,500 $3,905
68,875
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs