Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product METAL CARTS & TRUCKS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 28,000
pieces
Production Hrs. Annual 2,295
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,923 378,957
kWh
Natural Gas $33,854 8,591
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $1,473 $77 $451
-
kWh
$1,022
-
MMBtu
02 2.1213: Direct warmest air to combustion intake $620 $177 $275
5,862
kWh
$345
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $1,966 $4,200 $(-36.0)
(-879)
kWh
$2,002
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $600 $800 - $600
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $307 $500 - $307
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $260 $750 $260
5,569
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $191 $150 $191
4,103
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $401 $393 $401
8,499
kWh
-
TOTAL RECOMMENDED $5,818 $7,047 $1,542
23,154
kWh
$4,276
-
MMBtu
TOTAL IMPLEMENTED $3,852 $2,847 $1,578
24,033
kWh
$2,274
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs