ITAC Assessment: CO0114
ITAC logo
ITAC Assessment: CO0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product GALVANIZED STEEL PARTS
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 10,000
ton
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,611 368,113
kWh
Natural Gas $89,014 21,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $216 $100 $216
4,396
kWh
-
02 2.2136: Install / repair insulation on steam lines $1,655 $1,545 - $1,655
-
MMBtu
03 2.2514: Cover open tanks $7,093 $1,400 - $7,093
-
MMBtu
04 2.2511: Insulate bare equipment $2,783 $2,400 - $2,783
-
MMBtu
05 2.6218: Turn off equipment when not in use $1,713 $1,700 - $1,713
-
MMBtu
06 2.2514: Cover open tanks $29,547 $4,600 - $29,547
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $7,311 $12,500 - $7,311
-
MMBtu
08 2.7229: Air condition only space necessary $903 $100 - $903
-
MMBtu
09 2.7221: Lower temperature during the winter season and vice-versa $182 $150 - $182
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $40 $97 $40
879
kWh
-
TOTAL RECOMMENDED $51,443 $24,592 $256
5,275
kWh
$51,187
-
MMBtu
TOTAL IMPLEMENTED $36,096 $10,495 $216
4,396
kWh
$35,880
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs