Assessment Year | 1988 |
---|---|
Principal Product | GALVANIZED STEEL PARTS |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 25 |
Plant Area |
n/a
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $18,611 | 368,113 |
kWh
|
$0.051 |
Natural Gas | $89,014 | 21,816 |
MMBtu
|
$4.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,443 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,096 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $216 | $100 |
$216
4,396
kWh
|
- | |
02 | 2.2136: Install / repair insulation on steam lines | $1,655 | $1,545 | - |
$1,655
-
MMBtu
|
|
03 | 2.2514: Cover open tanks | $7,093 | $1,400 | - |
$7,093
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $2,783 | $2,400 | - |
$2,783
-
MMBtu
|
|
05 | 2.6218: Turn off equipment when not in use | $1,713 | $1,700 | - |
$1,713
-
MMBtu
|
|
06 | 2.2514: Cover open tanks | $29,547 | $4,600 | - |
$29,547
-
MMBtu
|
|
07 | 2.2414: Use waste heat from hot flue gases to preheat | $7,311 | $12,500 | - |
$7,311
-
MMBtu
|
|
08 | 2.7229: Air condition only space necessary | $903 | $100 | - |
$903
-
MMBtu
|
|
09 | 2.7221: Lower temperature during the winter season and vice-versa | $182 | $150 | - |
$182
-
MMBtu
|
|
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40 | $97 |
$40
879
kWh
|
- | |
TOTAL RECOMMENDED | $51,443 | $24,592 |
$256
5,275
kWh
|
$51,187
-
MMBtu
|
||
TOTAL IMPLEMENTED | $36,096 | $10,495 |
$216
4,396
kWh
|
$35,880
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs