| Assessment Year | 1987 |
|---|---|
| Principal Product | INJECTION-MOLDED PLASTIC PARTS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 130 |
| Plant Area |
n/a
|
| Annual Production | 1,700,000
lb
|
| Production Hrs. Annual | 6,816
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $135,923 | 3,060,082 |
kWh
|
$0.044 |
| Natural Gas | $14,215 | 3,515 |
MMBtu
|
$4.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,247 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,150 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $4,100 | $6,900 |
$4,100
92,321
kWh
|
- | - | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,195 | $500 |
$6,195
139,508
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $349 | $200 |
$349
7,913
kWh
|
- | - | |
| 04 | 2.8121: Apply for tax-free status for energy purchases | $7,030 | $250 |
$6,480
-
kWh
|
$550
-
MMBtu
|
- | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,097 | - |
$2,097
-
kWh
|
- | $(-1,000.0) | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,602 | $35 |
$181
4,103
kWh
|
$2,421
-
MMBtu
|
- | |
| 07 | 2.7221: Lower temperature during the winter season and vice-versa | $264 | $150 | - |
$264
-
MMBtu
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $610 | $424 |
$610
13,775
kWh
|
- | - | |
| TOTAL RECOMMENDED | $22,247 | $8,459 |
$20,012
257,620
kWh
|
$3,235
-
MMBtu
|
$(-1,000.0) | ||
| TOTAL IMPLEMENTED | $21,150 | $8,459 |
$17,915
257,620
kWh
|
$3,235
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs