ITAC Assessment: CO0110
ITAC logo
ITAC Assessment: CO0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product INJECTION-MOLDED PLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area
n/a
Annual Production 1,700,000
lb
Production Hrs. Annual 6,816
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,923 3,060,082
kWh
Natural Gas $14,215 3,515
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $4,100 $6,900 $4,100
92,321
kWh
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $6,195 $500 $6,195
139,508
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $349 $200 $349
7,913
kWh
- -
04 2.8121: Apply for tax-free status for energy purchases $7,030 $250 $6,480
-
kWh
$550
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,097 - $2,097
-
kWh
- $(-1,000.0)
06 2.6212: Turn off equipment during breaks, reduce operating time $2,602 $35 $181
4,103
kWh
$2,421
-
MMBtu
-
07 2.7221: Lower temperature during the winter season and vice-versa $264 $150 - $264
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $610 $424 $610
13,775
kWh
- -
TOTAL RECOMMENDED $22,247 $8,459 $20,012
257,620
kWh
$3,235
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $21,150 $8,459 $17,915
257,620
kWh
$3,235
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs