ITAC Assessment: CO0086
ITAC logo
ITAC Assessment: CO0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PRECAST CONCRETE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 8,078
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,712 1,417,937
kWh
Natural Gas $198,049 49,791
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,855

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $12,235 $300 - $12,235
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $8,294 $3,331 - $8,294
-
MMBtu
03 2.1222: Install turbulators $5,059 $1,700 - $5,059
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $7,419 $16,669 - $7,419
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $10,077 $16,800 - $10,077
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,421 $400 $7,421
81,770
kWh
-
07 2.4312: Improve lubrication practices $1,968 - $1,968
21,688
kWh
-
08 2.2437: Recover waste heat from equipment $784 $200 - $784
-
MMBtu
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,041 $70 $24,451
24,033
kWh
$(-410.0)
-
MMBtu
10 2.6242: Minimize operation of equipment maintained in standby condition $18,372 $500 - $18,372
-
MMBtu
11 2.4133: Use most efficient type of electric motors $372 $869 $372
4,103
kWh
-
12 2.6218: Turn off equipment when not in use $2,289 $700 - $2,289
-
MMBtu
13 2.7142: Utilize higher efficiency lamps and/or ballasts $559 $589 $559
6,155
kWh
-
TOTAL RECOMMENDED $98,890 $42,128 $34,771
137,749
kWh
$64,119
-
MMBtu
TOTAL IMPLEMENTED $80,855 $22,170 $31,872
105,803
kWh
$48,983
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs