| Assessment Year | 1986 |
|---|---|
| Principal Product | PACKAGED TURKEY |
| NAICS |
n/a
|
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
n/a
|
| Annual Production | 2,400,000
lb
|
| Production Hrs. Annual | 2,640
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $215,961 | 3,575,909 |
kWh
|
$0.060 |
| Natural Gas | $56,771 | 12,677 |
MMBtu
|
$4.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,393 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,301 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,554 | $250 | - |
$2,554
-
MMBtu
|
|
| 02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $6,698 | $6,000 | - |
$6,698
-
MMBtu
|
|
| 03 | 2.1222: Install turbulators | $1,622 | $600 | - |
$1,622
-
MMBtu
|
|
| 04 | 2.3191: Use demand controller or load shedder | $17,849 | $4,900 |
$17,849
-
kWh
|
- | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,444 | $2,300 |
$8,843
177,902
kWh
|
$(-3,399.0)
-
MMBtu
|
|
| 06 | 2.2122: Install / repair insulation on condensate lines | $2,182 | $1,825 | - |
$2,182
-
MMBtu
|
|
| 07 | 2.2136: Install / repair insulation on steam lines | $2,052 | $1,570 | - |
$2,052
-
MMBtu
|
|
| 08 | 2.2113: Repair or replace steam traps | $125 | $200 | - |
$125
-
MMBtu
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,151 | $1,148 |
$1,151
19,050
kWh
|
- | |
| 10 | 2.2447: Heat water with exhaust heat | $1,716 | $8,000 | - |
$1,716
-
MMBtu
|
|
| TOTAL RECOMMENDED | $41,393 | $26,793 |
$27,843
196,952
kWh
|
$13,550
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,301 | $1,050 | - |
$4,301
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs