ITAC Assessment: CO0066
ITAC logo
ITAC Assessment: CO0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PACKAGED TURKEY
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 2,400,000
lb
Production Hrs. Annual 2,640
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,961 3,575,909
kWh
Natural Gas $56,771 12,677
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,554 $250 - $2,554
-
MMBtu
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $6,698 $6,000 - $6,698
-
MMBtu
03 2.1222: Install turbulators $1,622 $600 - $1,622
-
MMBtu
04 2.3191: Use demand controller or load shedder $17,849 $4,900 $17,849
-
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,444 $2,300 $8,843
177,902
kWh
$(-3,399.0)
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $2,182 $1,825 - $2,182
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $2,052 $1,570 - $2,052
-
MMBtu
08 2.2113: Repair or replace steam traps $125 $200 - $125
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,151 $1,148 $1,151
19,050
kWh
-
10 2.2447: Heat water with exhaust heat $1,716 $8,000 - $1,716
-
MMBtu
TOTAL RECOMMENDED $41,393 $26,793 $27,843
196,952
kWh
$13,550
-
MMBtu
TOTAL IMPLEMENTED $4,301 $1,050 - $4,301
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs