| Assessment Year | 2025 |
|---|---|
| Principal Product | Concrete retaining wall and fencing components |
| NAICS | 327390: Other Concrete Product Manufacturing |
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $1 M to 5M |
| # of Employees | 33 |
| Plant Area |
44,028
ft2
|
| Annual Production | 40,000
ton
|
| Production Hrs. Annual | 3,510
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $11,840 | 257,400 |
kWh
|
$0.046 |
| Electricity Demand | $20,574 | 1,053 |
kW-mo/yr
|
$19.54 |
| Electricity Fees | $2,433 | - |
|
- |
| Natural Gas | $37,882 | 2,984 |
MMBtu
|
$12.69 |
| TOTAL YEARLY COSTS | $72,729 | |||
| RECOMMENDED SAVINGS* | $19,967 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $12,692 | $150,694 |
$7,534
163,803
kWh
|
$5,158
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,193 | - |
$498
10,825
kWh
|
$695
-
kW-mo/yr
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $798 | $405 |
$303
6,589
kWh
|
$495
-
kW-mo/yr
|
- | - | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $894 | $8,570 |
$286
6,215
kWh
|
$608
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $557 | $217 |
$222
4,831
kWh
|
$335
-
kW-mo/yr
|
- | - | |
| 06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,409 | $4,933 | - | - |
$3,409
-
MMBtu
|
- | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $424 | $550 |
$(-12.1)
(-262)
kWh
|
- | - |
$436
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,967 | $165,369 |
$8,831
192,001
kWh
|
$7,291
-
kW-mo/yr
|
$3,409
-
MMBtu
|
$436
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs