ITAC Assessment: CM1034
ITAC logo
ITAC Assessment: CM1034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 12
Plant Area 25,400
ft2
Annual Production 423,400
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,121 1,903,040
kWh
Electricity Demand $40,218 3,356
kW-mo/yr
Electricity Fees $1,764 -
Natural Gas $24,385 2,128
MMBtu
TOTAL YEARLY COSTS $205,488
RECOMMENDED SAVINGS* $132,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $116,440 $806,623 $93,439
1,278,246
kWh
$23,001
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,576 $13,769 $2,315
31,740
kWh
$1,261
-
kW-mo/yr
- -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $5,345 $4,749 $389
5,338
kWh
- $4,956
-
MMBtu
-
04 2.7135: Install occupancy sensors $34 $68 $17
228
kWh
$17
-
kW-mo/yr
- -
05 2.1224: Replace boiler $110 $2,000 - - $110
-
MMBtu
-
06 2.8114: Change rate schedules or other changes in utility service $6,628 $800 - - - $6,628
TOTAL RECOMMENDED $132,133 $828,009 $96,160
1,315,552
kWh
$24,279
-
kW-mo/yr
$5,066
-
MMBtu
$6,628
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs