ITAC Assessment: CM1028
ITAC logo
ITAC Assessment: CM1028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Education
NAICS 611210: Junior Colleges
SIC 8222: Junior Colleges and Technical Institutes
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 47,730
ft2
Annual Production 937
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,207 173,600
kWh
Electricity Demand $10,212 518
kW-mo/yr
Electricity Fees $2,939 -
Natural Gas $31,256 3,025
MMBtu
TOTAL YEARLY COSTS $52,614
RECOMMENDED SAVINGS* $25,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $13,684 $157,395 $12,950
(-273,781)
kWh
$734
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,427 $10,918 $2,854
60,371
kWh
$3,573
-
kW-mo/yr
-
03 2.7272: Install heat pipes / raise cooling setpoint $4,628 - - - $4,628
-
MMBtu
04 2.7131: Add area lighting switches $507 $936 $507
10,712
kWh
- -
TOTAL RECOMMENDED $25,246 $169,249 $16,311
(-202,698)
kWh
$4,307
-
kW-mo/yr
$4,628
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs