ITAC Assessment: CM1009
ITAC logo
ITAC Assessment: CM1009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Pump & Compressor Manufacturing
NAICS 333912: Air and Gas Compressor Manufacturing
SIC 3563: Air and Gas Compressors
Sales Range $50
M
to 100
M
# of Employees 698
Plant Area 191,000
ft2
Annual Production 1,800
units
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,194 6,981,210
kWh
Electricity Demand $362,600 23,500
kW-mo/yr
Electricity Fees $50,304 -
Natural Gas $76,078 10,598
MMBtu
Waste Disposal Costs
Water Usage $33,033 3,963
Tgal
TOTAL YEARLY COSTS $822,209
RECOMMENDED SAVINGS* $49,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $24,500 $8,000 - - $24,500
02 2.2622: Replace existing chiller with high efficiency model $13,200 $201,300 $7,600
179,500
kWh
$5,600
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $6,100 $96,500 $3,600
89,500
kWh
$2,500
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,380 $50 $3,700
82,800
kWh
$1,680
-
kW-mo/yr
-
TOTAL RECOMMENDED $49,180 $305,850 $14,900
351,800
kWh
$9,780
-
kW-mo/yr
$24,500
TOTAL IMPLEMENTED $13,200 $201,300 $7,600
179,500
kWh
$5,600
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs