| Assessment Year | 2023 |
|---|---|
| Principal Product | Pump & Compressor Manufacturing |
| NAICS | 333912: Air and Gas Compressor Manufacturing |
| SIC | 3563: Air and Gas Compressors |
| Sales Range | $50 M to 100M |
| # of Employees | 698 |
| Plant Area |
191,000
ft2
|
| Annual Production | 1,800
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $300,194 | 6,981,210 |
kWh
|
$0.043 | |
| Electricity Demand | $362,600 | 23,500 |
kW-mo/yr
|
$15.43 | |
| Electricity Fees | $50,304 | - |
|
- | |
| Natural Gas | $76,078 | 10,598 |
MMBtu
|
$7.18 | |
| Waste Disposal Costs | |||||
| Water Usage | $33,033 | 3,963 |
Tgal
|
$8.34 | |
| TOTAL YEARLY COSTS | $822,209 | ||||
| RECOMMENDED SAVINGS* | $49,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $13,200 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $24,500 | $8,000 | - | - | $24,500 | |
| 02 | 2.2622: Replace existing chiller with high efficiency model | $13,200 | $201,300 |
$7,600
179,500
kWh
|
$5,600
-
kW-mo/yr
|
- | |
| 03 | 2.9114: Use solar heat to make electricty | $6,100 | $96,500 |
$3,600
89,500
kWh
|
$2,500
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,380 | $50 |
$3,700
82,800
kWh
|
$1,680
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $49,180 | $305,850 |
$14,900
351,800
kWh
|
$9,780
-
kW-mo/yr
|
$24,500 | ||
| TOTAL IMPLEMENTED | $13,200 | $201,300 |
$7,600
179,500
kWh
|
$5,600
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs