| Assessment Year | 2022 |
|---|---|
| Principal Product | Office Leasing |
| NAICS | 531190: Lessors of Other Real Estate Property |
| SIC | 6519: Lessors of Real Property, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 3 |
| Plant Area |
108,700
ft2
|
| Annual Production | 80,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $110,571 | 2,592,000 |
kWh
|
$0.043 | |
| Electricity Demand | $93,504 | 4,853 |
kW-mo/yr
|
$19.27 | |
| Natural Gas | $15,500 | 2,411 |
MMBtu
|
$6.43 | |
| Waste Disposal Costs | |||||
| Water Usage | $38,000 | 4,200 |
Tgal
|
$9.05 | |
| TOTAL YEARLY COSTS | $257,575 | ||||
| RECOMMENDED SAVINGS* | $83,422 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $83,422 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $41,100 | $630,000 |
$6,400
150,000
kWh
|
$34,700
-
kW-mo/yr
|
- | - | |
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $15,820 | $50,000 |
$13,320
312,000
kWh
|
$2,500
-
kW-mo/yr
|
- | - | |
| 03 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $11,022 | $275,000 |
$2,733
64,000
kWh
|
$5,395
-
kW-mo/yr
|
$2,894
-
MMBtu
|
- | |
| 04 | 3.4151: Minimize water usage | $7,800 | $15,900 | - | - | - |
$7,800
-
Tgal
|
|
| 05 | 2.7272: Install heat pipes / raise cooling setpoint | $3,000 | $125 |
$2,760
64,700
kWh
|
$240
-
kW-mo/yr
|
- | - | |
| 06 | 2.1224: Replace boiler | $1,680 | $4,800 |
$(-160.0)
(-3,700)
kWh
|
$(-260.0)
-
kW-mo/yr
|
$2,100
-
MMBtu
|
- | |
| 07 | 2.1224: Replace boiler | $1,510 | $14,900 | - | - |
$1,510
-
MMBtu
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,490 | $2,690 |
$540
12,750
kWh
|
$950
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $83,422 | $993,415 |
$25,593
599,750
kWh
|
$43,525
-
kW-mo/yr
|
$6,504
-
MMBtu
|
$7,800
-
Tgal
|
||
| TOTAL IMPLEMENTED | $83,422 | $993,415 |
$25,593
599,750
kWh
|
$43,525
-
kW-mo/yr
|
$6,504
-
MMBtu
|
$7,800
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs