ITAC Assessment: CM1004
ITAC logo
ITAC Assessment: CM1004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Frozen Food Storage
NAICS 493120: Refrigerated Warehousing and Storage
SIC 4222: Refrigerated Warehousing and Storage
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 140,000
ft2
Annual Production 2,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,200 4,362,000
kWh
Electricity Demand $63,650 8,216
kW-mo/yr
Electricity Fees $34,920 -
Natural Gas $46,573 11,940
MMBtu
Waste Disposal Costs
Water Usage $1,731 528
Tgal
Water Disposal $5,295 919
Tgal
TOTAL YEARLY COSTS $344,369
RECOMMENDED SAVINGS* $110,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $21,300 $72,000 $21,300
484,000
kWh
- -
02 2.9114: Use solar heat to make electricty $20,500 $500,000 $8,900
203,000
kWh
$11,600
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $2,490 $4,850 $1,980
44,880
kWh
$510
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,250 $11,350 $1,600
36,000
kWh
$650
-
kW-mo/yr
-
05 2.3113: Make ice during off peak hours for cooling $10,340 $57,600 - $10,340
-
kW-mo/yr
-
06 2.3141: Use battery storage for demand control $36,190 $195,000 $3,850
87,240
kWh
$940
-
kW-mo/yr
$31,400
07 4.812: Apply for investment incentives $17,220 $8,000 - - $17,220
TOTAL RECOMMENDED $110,290 $848,800 $37,630
855,120
kWh
$24,040
-
kW-mo/yr
$48,620
TOTAL IMPLEMENTED $31,640 $129,600 $21,300
484,000
kWh
$10,340
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs