ITAC Assessment: CM1003
ITAC logo
ITAC Assessment: CM1003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Retail - Sporting Goods - Camping, Fishing & Hunting
NAICS 451110: Sporting Goods Stores
SIC 5941: Sporting Goods Stores and Bicycle Shops
Sales Range less than $500
k
# of Employees 24
Plant Area 180,000
ft2
Annual Production 80,000
units
Production Hrs. Annual 4,224
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,179 2,746,000
kWh
Electricity Demand $108,235 5,571
kW-mo/yr
Electricity Fees $38,776 -
Natural Gas $17,114 2,564
MMBtu
Waste Disposal Costs
Water Usage $17,321 3,884
Tgal
TOTAL YEARLY COSTS $298,625
RECOMMENDED SAVINGS* $105,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $66,142 $89,970 $31,812
747,300
kWh
$34,330
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $11,084 $182,500 $5,610
132,000
kWh
$5,474
-
kW-mo/yr
-
03 2.7134: Use photocell controls $780 $370 $410
9,720
kWh
$370
-
kW-mo/yr
-
04 2.3191: Use demand controller or load shedder $227 - $140
3,240
kWh
$87
-
kW-mo/yr
-
05 2.8117: Install sub-metering equipment $21,570 $3,250 - $21,570
-
kW-mo/yr
-
06 2.7243: Improve air circulation with destratification fans / other methods $5,296 $38,900 $(-317.0)
(-7,460)
kWh
$(-367.0)
-
kW-mo/yr
$5,980
-
MMBtu
TOTAL RECOMMENDED $105,099 $314,990 $37,655
884,800
kWh
$61,464
-
kW-mo/yr
$5,980
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs