ITAC Assessment: CM1002
ITAC logo
ITAC Assessment: CM1002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Educational Services
NAICS 611210: Junior Colleges
SIC 8222: Junior Colleges and Technical Institutes
Sales Range $1
M
to 5
M
# of Employees 424
Plant Area 100,000
ft2
Annual Production 2,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,982 5,181,696
kWh
Electricity Demand $171,386 9,558
kW-mo/yr
Electricity Fees $4,152 -
Natural Gas $102,780 16,800
MMBtu
Waste Disposal Costs
Water Usage $64,649 11,203
Tgal
TOTAL YEARLY COSTS $563,949
RECOMMENDED SAVINGS* $73,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,003 $44,000 $6,729
160,300
kWh
$5,274
-
kW-mo/yr
-
02 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $1,800 $100,000 $600
15,800
kWh
$700
-
kW-mo/yr
$500
-
MMBtu
03 2.4133: Use most efficient type of electric motors $410 $4,100 $240
5,500
kWh
$170
-
kW-mo/yr
-
04 2.1133: Adjust burners for efficient operation $4,300 $3,000 - - $4,300
-
MMBtu
05 2.7314: Reduce ventilation air $21,000 $740,000 $9,000
324,000
kWh
$12,000
-
kW-mo/yr
-
06 2.9114: Use solar heat to make electricty $32,600 $850,000 $32,600
358,000
kWh
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $220 $860 $220
6,800
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $900 $1,200 $500
14,000
kWh
$400
-
kW-mo/yr
-
TOTAL RECOMMENDED $73,233 $1,743,160 $49,889
884,400
kWh
$18,544
-
kW-mo/yr
$4,800
-
MMBtu
TOTAL IMPLEMENTED $33,003 $784,000 $15,729
484,300
kWh
$17,274
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs