ITAC Assessment: CL2101
ITAC logo
ITAC Assessment: CL2101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product electro plated contacts (reel-to-reel)
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 55,000
ft2
Annual Production 5,347
thousand feet
Production Hrs. Annual 5,040
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,355 2,251,991
kWh
Electricity Demand $75,569 7,210
kW-mo/yr
Electricity Fees $88 -
Natural Gas $6,572 617
MMBtu
Waste Disposal Costs
Water Usage $24,812 8,675
Tgal
Water Disposal $64,911 8,675
Tgal
TOTAL YEARLY COSTS $440,307
RECOMMENDED SAVINGS* $40,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,572 $6,373 $22,798
191,318
kWh
$4,774
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $9,334 $3,875 $9,334
78,332
kWh
- -
03 2.7261: Install timers and/or thermostats $848 $800 $848
7,115
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $1,276 $500 $1,276
10,711
kWh
- -
05 2.7261: Install timers and/or thermostats $1,761 $186 $255
2,142
kWh
$1,464
-
kW-mo/yr
$42
-
MMBtu
TOTAL RECOMMENDED $40,791 $11,734 $34,512
289,617
kWh
$6,238
-
kW-mo/yr
$42
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs