ITAC Assessment: CL1914
ITAC logo
ITAC Assessment: CL1914
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Muffins, cookies, frozen dough
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 425
Plant Area 212,000
ft2
Annual Production 240,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $935,272 19,358,612
kWh
Electricity Demand $543,948 43,200
kW-mo/yr
Electricity Fees $20,765 -
Natural Gas $88,836 20,111
MMBtu
TOTAL YEARLY COSTS $1,588,821
RECOMMENDED SAVINGS* $22,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,622

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,145 $2,800 $2,314
46,267
kWh
$831
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,477 $30,884 $9,147
182,933
kWh
$7,330
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,620 - $1,927
38,546
kWh
$693
-
kW-mo/yr
TOTAL RECOMMENDED $22,242 $33,684 $13,388
267,746
kWh
$8,854
-
kW-mo/yr
TOTAL IMPLEMENTED $19,622 $33,684 $11,461
229,200
kWh
$8,161
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs