ITAC Assessment: CL1911
ITAC logo
ITAC Assessment: CL1911
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Automotive parts & accessories
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 200,000
ft2
Annual Production 10,380,000
lb
Production Hrs. Annual 6,300
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $743,039 11,784,960
kWh
Electricity Demand $1 25,834
kW-mo/yr
Electricity Fees $1,565 -
Natural Gas $30,737 3,959
MMBtu
Waste Disposal Costs
Water Usage $5,588 3,272
Tgal
Water Disposal $5,588 3,272
Tgal
Other Liquid (haz) $1,800 100
gal
Solid Waste (non-haz) $1,200 100
lb
TOTAL YEARLY COSTS $789,518
RECOMMENDED SAVINGS* $75,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $46,300 $34,518 $46,300
734,921
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,115 $4,000 $21,115
335,164
kWh
03 2.7224: Reduce space conditioning during non-working hours $1,429 $250 $1,429
22,688
kWh
04 2.7442: Keep doors and windows shut when not on use $7,094 - $7,094
112,608
kWh
TOTAL RECOMMENDED $75,938 $38,768 $75,938
1,205,381
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs