ITAC Assessment: CL1909
ITAC logo
ITAC Assessment: CL1909
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product API )Active Phamaceutical Ingredients)
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 72,650
ft2
Annual Production 22,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,751 7,807,814
kWh
Electricity Demand $185,264 16,924
kW-mo/yr
Electricity Fees $7,049 -
Natural Gas $211,378 34,398
MMBtu
Other Energy $3,542 430
MMBtu
Waste Disposal Costs
Water Usage $1,299 5,148
Tgal
Water Disposal $11,375 5,148
Tgal
Other Liquid (haz) $1,089,000 89,650
gal
TOTAL YEARLY COSTS $1,853,658
RECOMMENDED SAVINGS* $167,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,417 $15,294 $12,249
278,385
kWh
$5,168
-
kW-mo/yr
- - -
02 2.2135: Repair and eliminate steam leaks $3,542 $2,040 - - $3,542
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $647 $2,080 $389
8,842
kWh
$258
-
kW-mo/yr
- - -
04 4.821: Pay bills on time to avoid late fees $2,971 - - - - - $2,971
05 3.6192: Use a less expensive method of waste removal $143,304 $600 - - - $143,304
-
gal
-
TOTAL RECOMMENDED $167,881 $20,014 $12,638
287,227
kWh
$5,426
-
kW-mo/yr
$3,542
-
MMBtu
$143,304
-
gal
$2,971
TOTAL IMPLEMENTED $7,160 $4,120 $389
8,842
kWh
$258
-
kW-mo/yr
$3,542
-
MMBtu
- $2,971