ITAC Assessment: CL1904
ITAC logo
ITAC Assessment: CL1904
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Boats, fiberglass center console
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 200,000
ft2
Annual Production 850
pieces
Production Hrs. Annual 2,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,671 1,833,648
kWh
Electricity Fees $466 -
Fuel Oil #1 $10,758 5,242
MMBtu
Waste Disposal Costs
Water Usage $5,236 100
Tgal
Water Disposal $6,232 100
Tgal
TOTAL YEARLY COSTS $185,363
RECOMMENDED SAVINGS* $51,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $35,719 $44,796 $35,719
396,876
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $2,689 - - $2,689
-
MMBtu
03 2.4226: Use / purchase optimum sized compressor $13,034 $38,500 $13,034
144,825
kWh
-
TOTAL RECOMMENDED $51,442 $83,296 $48,753
541,701
kWh
$2,689
-
MMBtu
TOTAL IMPLEMENTED $51,442 $83,296 $48,753
541,701
kWh
$2,689
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs