ITAC Assessment: CL1808
ITAC logo
ITAC Assessment: CL1808
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Electrical Signage
NAICS 339950: Sign Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 122
Plant Area 133,000
ft2
Annual Production 9,000
units
Production Hrs. Annual 2,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,954 1,780,000
kWh
Electricity Demand $112,709 4,858
kW-mo/yr
Electricity Fees $8,234 -
TOTAL YEARLY COSTS $215,897
RECOMMENDED SAVINGS* $18,042 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7224: Reduce space conditioning during non-working hours $8,900 $250 $8,900
178,000
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,697 $3,911 $2,035
40,707
kWh
$5,662
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,135 $2,080 $300
6,000
kWh
$835
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $310 - $310
6,196
kWh
-
TOTAL RECOMMENDED $18,042 $6,241 $11,545
230,903
kWh
$6,497
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs