ITAC Assessment: CL1806
ITAC logo
ITAC Assessment: CL1806
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Colorants and Additives
NAICS 325130: Synthetic Dye and Pigment Manufacturing
SIC 2816: Inorganic Pigments
Sales Range $100
M
to 500
M
# of Employees 114
Plant Area 90,000
ft2
Annual Production 81,954,002
lb
Production Hrs. Annual 4,992
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $555,152 11,565,675
kWh
Electricity Demand $29,081 2,639
kW-mo/yr
Natural Gas $173,465 32,183
MMBtu
Waste Disposal Costs
Water Usage $234,509 77,900,000
Tgal
TOTAL YEARLY COSTS $992,207
RECOMMENDED SAVINGS* $184,214 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.1221: Replace obsolete burners with more efficient ones $66,598 $22,500 - - $66,598
-
MMBtu
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $45,354 $46,500 $31,397
654,100
kWh
$13,957
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $34,631 $52,880 $25,090
522,696
kWh
$9,541
-
kW-mo/yr
- -
04 3.4156: Use flow control valves on equipment to optimize water use $23,451 $12,200 - - - $23,451
-
Tgal
05 3.4159: Replace treated water with well / surface water $7,271 $4,700 - - - $7,271
-
Tgal
06 2.4131: Size electric motors for peak operating efficiency $6,909 - $5,256
109,500
kWh
$1,653
-
kW-mo/yr
- -
TOTAL RECOMMENDED $184,214 $138,780 $61,743
1,286,296
kWh
$25,151
-
kW-mo/yr
$66,598
-
MMBtu
$30,722
-
Tgal
TOTAL IMPLEMENTED $41,540 $52,880 $30,346
632,196
kWh
$11,194
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings