*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Food Packaging Equipment (Conveyors, Shrink Tunnels, Bag Loaders, etc.)
NAICS 333993: Packaging Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 125,000
ft2
Annual Production 36,000
units
Production Hrs. Annual 2,080
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,954 3,135,858
kWh
Electricity Demand $97,615 7,872
kW-mo/yr
Natural Gas $11,200 1,318
MMBtu
Waste Disposal Costs
Water Usage $6,368 638,423
Tgal
TOTAL YEARLY COSTS $231,137
RECOMMENDED SAVINGS* $53,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,874

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.7232: Replace existing hvac unit with high efficiency model $50,691 $506,862 $26,647
720,200
kWh
$24,044
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $2,183 $13,011 $1,453
39,283
kWh
$730
-
kW-mo/yr
-
03 3.4156: Use flow control valves on equipment to optimize water use $637 $2,500 - - $637
-
Tgal
TOTAL RECOMMENDED $53,511 $522,373 $28,100
759,483
kWh
$24,774
-
kW-mo/yr
$637
-
Tgal
TOTAL IMPLEMENTED $52,874 $519,873 $28,100
759,483
kWh
$24,774
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs