| Assessment Year | 2018 |
|---|---|
| Principal Product | metal finishing services |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 34 |
| Plant Area |
30,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $134,274 | 1,918,201 |
kWh
|
$0.070 |
| Electricity Demand | $34,305 | 3,994 |
kW-mo/yr
|
$8.59 |
| Natural Gas | $6,300 | 788 |
MMBtu
|
$8.00 |
| TOTAL YEARLY COSTS | $174,879 | |||
| RECOMMENDED SAVINGS* | $54,835 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $54,835 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $40,277 | $14,300 |
$32,340
462,000
kWh
|
$7,937
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,516 | $9,852 |
$8,048
114,792
kWh
|
$1,468
-
kW-mo/yr
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,656 | $2,080 |
$3,986
56,940
kWh
|
$670
-
kW-mo/yr
|
|
| 04 | 2.6218: Turn off equipment when not in use | $386 | - |
$386
5,507
kWh
|
- | |
| TOTAL RECOMMENDED | $54,835 | $26,232 |
$44,760
639,239
kWh
|
$10,075
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $54,835 | $26,232 |
$44,760
639,239
kWh
|
$10,075
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs