Assessment Year | 2017 |
---|---|
Principal Product | Zinc Nickle platings of Coatings, forgings, stampings, E-coatings, powde |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 112 |
Plant Area |
170,000
ft2
|
Annual Production | 50,000,000
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $391,384 | 5,937,160 |
kWh
|
$0.066 | |
Electricity Demand | $5,165 | 516 |
kW-mo/yr
|
$10.01 | |
Natural Gas | $232,573 | 44,192 |
MMBtu
|
$5.26 | |
Waste Disposal Costs | |||||
Water Usage | $36,562 | 16,177 |
Tgal
|
$2.26 | |
TOTAL YEARLY COSTS | $665,684 | ||||
RECOMMENDED SAVINGS* | $56,445 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $20,281 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.4115: Recover and reuse cooling water | $31,006 | - | - | - | - |
$31,006
-
Tgal
|
|
02 | 2.2421: Install waste heat boiler to provide direct power | $11,470 | $15,000 | - | - |
$11,470
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,811 | $21,000 |
$6,843
103,803
kWh
|
$1,968
-
kW-mo/yr
|
- | - | |
04 | 3.4156: Use flow control valves on equipment to optimize water use | $3,656 | $3,050 | - | - | - |
$3,656
-
Tgal
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,502 | $900 |
$1,032
15,652
kWh
|
$470
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $56,445 | $39,950 |
$7,875
119,455
kWh
|
$2,438
-
kW-mo/yr
|
$11,470
-
MMBtu
|
$34,662
-
Tgal
|
||
TOTAL IMPLEMENTED | $20,281 | $36,000 |
$6,843
103,803
kWh
|
$1,968
-
kW-mo/yr
|
$11,470
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs