Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Powered Industrial Trucks (forklifts, material tuggers and paller jacks)
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 300,000
ft2
Annual Production 3,000
units
Production Hrs. Annual 2,080
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,786 2,297,751
kWh
Electricity Demand $190,440 12,000
kW-mo/yr
Electricity Fees $0.0 -
Natural Gas $3,602 375
MMBtu
Waste Disposal Costs
Water Usage $4,437 420,000
Tgal
TOTAL YEARLY COSTS $308,265
RECOMMENDED SAVINGS* $28,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,132 $16,213 $5,038
105,441
kWh
$6,094
-
kW-mo/yr
02 2.7224: Reduce space conditioning during non-working hours $10,978 $250 $10,978
229,770
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,002 $2,080 $1,374
28,766
kWh
$2,628
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $2,406 - $2,406
50,355
kWh
-
TOTAL RECOMMENDED $28,518 $18,543 $19,796
414,332
kWh
$8,722
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs