| Assessment Year | 2026 |
|---|---|
| Principal Product | Office Building |
| NAICS | 525990: Other Financial Vehicles |
| SIC | 6512: Operators of Nonresidential Buildings |
| Sales Range | $5 M to 10M |
| # of Employees | 200 |
| Plant Area |
45,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $26,561 | 175,560 |
kWh
|
$0.15 |
| Electricity Demand | $14,436 | 970 |
kW-mo/yr
|
$14.88 |
| Electricity Fees | $13,772 | - |
|
- |
| Natural Gas | $3,467 | 176 |
MMBtu
|
$19.70 |
| Other Gas | $532 | 1 |
MMBtu
|
$532.00 |
| TOTAL YEARLY COSTS | $58,768 | |||
| RECOMMENDED SAVINGS* | $42,501 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $21,814 | $404,412 |
$18,714
123,690
kWh
|
$3,100
-
kW-mo/yr
|
|
| 02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $8,168 | $20,760 |
$8,168
46,276
kWh
|
- | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $6,539 | $75,000 |
$1,992
13,167
kWh
|
$4,547
-
kW-mo/yr
|
|
| 04 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $2,391 | $26,500 |
$2,391
15,800
kWh
|
- | |
| 05 | 2.7262: Separate controls of air handlers from ac/ heating systems | $2,083 | $600 |
$2,083
13,770
kWh
|
- | |
| 06 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $902 | $1,500 |
$402
2,658
kWh
|
$500
-
kW-mo/yr
|
|
| 07 | 2.7135: Install occupancy sensors | $604 | $2,000 |
$410
2,708
kWh
|
$194
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $42,501 | $530,772 |
$34,160
218,069
kWh
|
$8,341
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs