| Assessment Year | 2026 |
|---|---|
| Principal Product | Aerospace Fuel Systems |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $100 M to 500M |
| # of Employees | 160 |
| Plant Area |
149,273
ft2
|
| Annual Production | 10,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $195,579 | 1,487,925 |
kWh
|
$0.13 | |
| Electricity Demand | $204,341 | 8,291 |
kW-mo/yr
|
$24.65 | |
| Electricity Fees | $13,353 | - |
|
- | |
| LPG | $6,240 | 190 |
MMBtu
|
$32.79 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,352 | 369 |
Tgal
|
$3.66 | |
| Other Liquid (non-haz) | $6,072 | 1 |
gal
|
$6,072.00 | |
| TOTAL YEARLY COSTS | $426,937 | ||||
| RECOMMENDED SAVINGS* | $230,522 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $70,614 | $464,950 |
$55,084
419,212
kWh
|
$15,530
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $65,080 | $1,300 |
$52,944
402,932
kWh
|
$12,136
-
kW-mo/yr
|
- | |
| 03 | 2.3141: Use battery storage for demand control | $28,645 | $100,000 |
$13,115
99,813
kWh
|
$15,530
-
kW-mo/yr
|
- | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $21,318 | $150,000 |
$21,318
81,120
kWh
|
- | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $15,432 | - |
$15,432
117,429
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,379 | $15,000 |
$4,364
33,216
kWh
|
$8,015
-
kW-mo/yr
|
- | |
| 07 | 2.3132: Recharge batteries on during off-peak demand periods | $7,987 | $200 | - |
$7,987
-
kW-mo/yr
|
- | |
| 08 | 2.7135: Install occupancy sensors | $4,821 | $4,000 |
$4,821
36,691
kWh
|
- | - | |
| 09 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $4,246 | $16,000 |
$(-1,039.0)
(-7,904)
kWh
|
$(-955.0)
-
kW-mo/yr
|
$6,240
-
MMBtu
|
|
| TOTAL RECOMMENDED | $230,522 | $751,450 |
$166,039
1,182,509
kWh
|
$58,243
-
kW-mo/yr
|
$6,240
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs