| Assessment Year | 2026 |
|---|---|
| Principal Product | Office Building |
| NAICS | 531210: Offices of Real Estate Agents and Brokers |
| SIC | 6531: Real Estate Agents and Managers |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
33,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $56,093 | 186,649 |
kWh
|
$0.30 |
| Electricity Fees | $2,060 | - |
|
- |
| Natural Gas | $1,912 | 86 |
MMBtu
|
$22.23 |
| Other Gas | $392 | 1 |
MMBtu
|
$392.00 |
| TOTAL YEARLY COSTS | $60,457 | |||
| RECOMMENDED SAVINGS* | $55,754 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $29,317 | $88,841 |
$29,317
97,561
kWh
|
- | |
| 02 | 2.7262: Separate controls of air handlers from ac/ heating systems | $9,168 | $2,400 |
$9,168
30,509
kWh
|
- | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $5,609 | $28,000 |
$5,609
18,665
kWh
|
- | |
| 04 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $4,207 | $21,000 |
$4,207
13,999
kWh
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,497 | $1,000 |
$3,497
11,638
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,373 | $9,603 |
$3,373
11,226
kWh
|
- | |
| 07 | 2.1321: Replace fossil fuel equipment with electrical equipment | $583 | $2,500 | - |
$583
-
MMBtu
|
|
| TOTAL RECOMMENDED | $55,754 | $153,344 |
$55,171
183,598
kWh
|
$583
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs