ITAC Assessment: CI0057
ITAC logo
ITAC Assessment: CI0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Airframe Detail Parts and Subassemblies
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 92,310
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,675
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,976 1,902,561
kWh
Electricity Fees $15,189 -
Natural Gas $68,977 5,383
MMBtu
LPG $3,855 342
MMBtu
Other Gas $9,336 1
MMBtu
Waste Disposal Costs
Water Usage $5,164 706
Tgal
Water Disposal $4,676 706
Tgal
TOTAL YEARLY COSTS $325,173
RECOMMENDED SAVINGS* $129,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.9114: Use solar heat to make electricty $76,405 $652,385 $76,405
666,707
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,244 $5,400 $14,244
124,290
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $12,003 $3,000 $12,003
104,738
kWh
-
04 2.2437: Recover waste heat from equipment $10,835 $6,000 $10,835
94,545
kWh
-
05 2.6218: Turn off equipment when not in use $7,108 $1,000 $7,108
62,021
kWh
-
06 2.4133: Use most efficient type of electric motors $5,959 $5,130 $5,959
51,997
kWh
-
07 2.8227: Adjust / maintain fork lift trucks for most efficient operation $2,555 $12,000 $(-1,300.0)
(-11,340)
kWh
$3,855
-
MMBtu
TOTAL RECOMMENDED $129,109 $684,915 $125,254
1,092,958
kWh
$3,855
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs