ITAC Assessment: CI0054
ITAC logo
ITAC Assessment: CI0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aluminum Extrusion and Aluminum Doors
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area 90,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,722 2,023,771
kWh
Electricity Demand $249,872 6,098
kW-mo/yr
Electricity Fees $37,287 -
Natural Gas $54,575 5,014
MMBtu
Other Gas $7,685 1
MMBtu
Waste Disposal Costs
Water Usage $9,892 1,359,864
Tgal
Other Liquid (non-haz) $5,616 1
gal
TOTAL YEARLY COSTS $591,649
RECOMMENDED SAVINGS* $547,981 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $178,607 $160,000 $86,894
775,840
kWh
$91,713
-
kW-mo/yr
-
02 4.212: Adopt in-house material generation $173,671 $246,000 $(-25,590.0)
(-228,487)
kWh
- $199,261
03 2.9114: Use solar heat to make electricty $83,244 $844,770 $50,378
449,806
kWh
$32,866
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $63,388 $5,500 $37,762
337,164
kWh
$25,626
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $24,625 $6,460 $11,974
106,912
kWh
$12,651
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $9,124 $500 $9,124
81,463
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,158 $32,500 $8,158
36,045
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $5,048 $25 $5,048
45,076
kWh
- -
09 2.7135: Install occupancy sensors $2,116 $4,650 $1,087
9,709
kWh
$1,029
-
kW-mo/yr
-
TOTAL RECOMMENDED $547,981 $1,300,405 $184,835
1,613,528
kWh
$163,885
-
kW-mo/yr
$199,261
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs