ITAC Assessment: CI0024
ITAC logo
ITAC Assessment: CI0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Medical Device Components
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 28
Plant Area 17,123
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,656 771,288
kWh
Electricity Demand $37,349 2,229
kW-mo/yr
Electricity Fees $8,662 -
LPG $1,285 114
MMBtu
Waste Disposal Costs
Water Usage $792 206
Tgal
Water Disposal $2,233 206
Tgal
TOTAL YEARLY COSTS $94,977
RECOMMENDED SAVINGS* $47,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.9114: Use solar heat to make electricty $21,490 $159,041 $14,152
244,416
kWh
$7,338
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,432 $2,000 $5,417
93,566
kWh
$3,015
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,658 $3,828 $5,328
92,018
kWh
$330
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $3,369 - $3,369
58,188
kWh
- -
05 2.6218: Turn off equipment when not in use $2,729 - $2,729
47,132
kWh
- -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $2,179 $7,910 $2,179
37,630
kWh
- -
07 2.7226: Use computer programs to optimize hvac performance $1,423 $15,000 $1,423
24,584
kWh
- -
08 2.7135: Install occupancy sensors $1,298 $1,800 $802
13,857
kWh
$496
-
kW-mo/yr
-
09 2.8227: Adjust / maintain fork lift trucks for most efficient operation $1,090 $6,000 $(-195.0)
(-3,370)
kWh
- $1,285
-
MMBtu
TOTAL RECOMMENDED $47,668 $195,579 $35,204
608,021
kWh
$11,179
-
kW-mo/yr
$1,285
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs