| Assessment Year | 2023 |
|---|---|
| Principal Product | Packaged Food Products |
| NAICS | 311991: Perishable Prepared Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 145 |
| Plant Area |
68,000
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $435,603 | 3,794,897 |
kWh
|
$0.11 | |
| Electricity Demand | $286,480 | 16,438 |
kW-mo/yr
|
$17.43 | |
| Electricity Fees | $32,462 | - |
|
- | |
| Natural Gas | $168,145 | 11,899 |
MMBtu
|
$14.13 | |
| Waste Disposal Costs | |||||
| Water Usage | $27,593 | 5,800 |
Tgal
|
$4.76 | |
| Water Disposal | $2,629 | 5,800 |
Tgal
|
$0.45 | |
| TOTAL YEARLY COSTS | $952,912 | ||||
| RECOMMENDED SAVINGS* | $414,731 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $78,325 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $271,104 | $1,391,144 |
$218,361
1,902,137
kWh
|
$52,743
-
kW-mo/yr
|
- | |
| 02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $63,711 | $90,000 |
$(-90,508.0)
(-788,400)
kWh
|
$(-9,411.0)
-
kW-mo/yr
|
$163,630
-
MMBtu
|
|
| 03 | 2.1224: Replace boiler | $25,947 | $36,000 |
$(-45,053.0)
(-392,448)
kWh
|
$(-4,685.0)
-
kW-mo/yr
|
$75,685
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,971 | $39,000 |
$21,507
187,342
kWh
|
$464
-
kW-mo/yr
|
- | |
| 05 | 2.3137: Use power during off-peak periods | $12,483 | $22,000 | - |
$12,483
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,433 | $1,500 |
$9,429
82,134
kWh
|
$2,004
-
kW-mo/yr
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,491 | - |
$5,346
46,568
kWh
|
$1,145
-
kW-mo/yr
|
- | |
| 08 | 2.2442: Preheat combustion air with waste heat | $1,591 | $5,000 |
$964
8,394
kWh
|
$627
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $414,731 | $1,584,644 |
$120,046
1,045,727
kWh
|
$55,370
-
kW-mo/yr
|
$239,315
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $78,325 | $98,500 |
$(-8,771.0)
(-76,404)
kWh
|
$11,411
-
kW-mo/yr
|
$75,685
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs