ITAC Assessment: CI0012
ITAC logo
ITAC Assessment: CI0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Community Center
NAICS 624120: Services for the Elderly and Persons with Disabilities
SIC 8322: Individual and Family Social Services
Sales Range less than $500
k
# of Employees 1
Plant Area 66,020
ft2
Annual Production 1
units
Production Hrs. Annual 5,096
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,038 1,468,454
kWh
TOTAL YEARLY COSTS $370,038
RECOMMENDED SAVINGS* $214,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $73,094 $83,743 $73,094
290,071
kWh
02 2.9114: Use solar heat to make electricty $48,677 $330,808 $48,677
193,170
kWh
03 2.7226: Use computer programs to optimize hvac performance $37,006 $28,350 $37,006
146,521
kWh
04 2.7135: Install occupancy sensors $24,550 $9,000 $24,550
97,425
kWh
05 2.7262: Separate controls of air handlers from ac/ heating systems $13,935 $8,000 $13,935
55,301
kWh
06 2.6214: Shut off pilots in standby equipment $9,977 $1,040 $9,977
39,594
kWh
07 2.1321: Replace fossil fuel equipment with electrical equipment $5,614 $8,200 $5,614
22,279
kWh
08 2.4133: Use most efficient type of electric motors $1,166 $2,400 $1,166
4,629
kWh
TOTAL RECOMMENDED $214,019 $471,541 $214,019
848,990
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs