ITAC Assessment: CI0002
ITAC logo
ITAC Assessment: CI0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Residential Door Locks and Cabinet Hardware Accessories
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 389
Plant Area 218,600
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,060
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,304 1,386,000
kWh
Natural Gas $15,033 1,397
MMBtu
LPG $38,508 1
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $332,846
RECOMMENDED SAVINGS* $104,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8227: Adjust / maintain fork lift trucks for most efficient operation $33,479 $80,000 - $33,479
-
MMBtu
- -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $27,300 $24,600 $27,300
135,486
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,201 $1,800 $18,201
90,329
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $12,649 $30,000 $12,649
62,776
kWh
- - -
05 2.4325: Upgrade conveyors $3,825 $8,040 - - $3,825 -
06 2.6218: Turn off equipment when not in use $3,680 - $3,680
18,262
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,733 $2,167 $2,733
13,563
kWh
- - -
08 2.7135: Install occupancy sensors $1,717 $2,625 $1,717
8,520
kWh
- - -
09 2.7134: Use photocell controls $1,322 $1,350 $1,152
5,718
kWh
- $77 $93
TOTAL RECOMMENDED $104,906 $150,582 $67,432
334,654
kWh
$33,479
-
MMBtu
$3,902 $93
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs