ITAC Assessment: CC0039
ITAC logo
ITAC Assessment: CC0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Olechemicals
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 42,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,386 1,282,166
kWh
Electricity Demand $54,844 3,242
kW-mo/yr
Electricity Fees $1,402 -
Natural Gas $203,626 48,922
MMBtu
TOTAL YEARLY COSTS $331,258
RECOMMENDED SAVINGS* $84,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,082 $7,780 $6,359
113,552
kWh
$3,723
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $8,467 - $8,467
151,191
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $718 $1,000 $454
8,112
kWh
$264
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,557 $5,600 $2,628
46,930
kWh
$1,929
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $21,466 $68,475 $3,569
63,724
kWh
- $17,897
-
MMBtu
06 2.2162: Reduce excess steam bleeding $11,803 - - - $11,803
-
MMBtu
07 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,905 - - - $2,905
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $878 $2,642 $435
7,764
kWh
$443
-
kW-mo/yr
-
09 2.9114: Use solar heat to make electricty $23,248 $226,305 $23,248
415,134
kWh
- -
TOTAL RECOMMENDED $84,124 $311,802 $45,160
806,407
kWh
$6,359
-
kW-mo/yr
$32,605
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs