ITAC Assessment: CC0037
ITAC logo
ITAC Assessment: CC0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product brominated flame retardants and plasticizers
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 50
Plant Area 70,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,536 3,710,594
kWh
Electricity Demand $57,690 6,952
kW-mo/yr
Electricity Fees $21,552 -
Natural Gas $346,271 62,120
MMBtu
TOTAL YEARLY COSTS $653,049
RECOMMENDED SAVINGS* $78,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,323 $22,680 $20,440
335,088
kWh
$3,883
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,523 $8,400 $13,001
213,138
kWh
$1,522
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,159 $1,880 $935
15,330
kWh
$224
-
kW-mo/yr
-
04 2.7111: Reduce illumination to minimum necessary levels $4,235 - $3,570
58,517
kWh
$665
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,282 $1,000 $1,924
31,536
kWh
$358
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $1,010 $2,500 - - $1,010
-
MMBtu
07 2.4239: Eliminate or reduce compressed air usage $11,158 $17,000 $9,405
154,176
kWh
$1,753
-
kW-mo/yr
-
08 2.2121: Increase amount of condensate returned $2,800 - - - $2,800
-
MMBtu
09 2.9114: Use solar heat to make electricty $17,257 $183,891 $17,257
282,899
kWh
- -
TOTAL RECOMMENDED $78,747 $237,351 $66,532
1,090,684
kWh
$8,405
-
kW-mo/yr
$3,810
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs