ITAC Assessment: CC0030
ITAC logo
ITAC Assessment: CC0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 31
Plant Area 208,000
ft2
Annual Production 1,034,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,249,904 17,800,329
kWh
Natural Gas $545,889 137,666
MMBtu
TOTAL YEARLY COSTS $1,795,793
RECOMMENDED SAVINGS* $182,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $905 $1,004 $905
12,930
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,211 $9,178 $13,211
188,726
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $67,679 $28,946 $67,679
966,847
kWh
-
04 2.2611: Moderate cooling tower outlet temperature $5,083 $1,269 $5,083
72,611
kWh
-
05 2.2425: Use flue gases to heat process or service water $64,875 $571,150 - $64,875
-
MMBtu
06 2.1224: Replace boiler $7,589 $100,666 - $7,589
-
MMBtu
07 2.2628: Utilize a less expensive cooling method $22,872 - $22,872
326,748
kWh
-
08 2.2511: Insulate bare equipment $219 $868 - $219
-
MMBtu
TOTAL RECOMMENDED $182,433 $713,081 $109,750
1,567,862
kWh
$72,683
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs