ITAC Assessment: CC0019
ITAC logo
ITAC Assessment: CC0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Laminate Flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 102,000
ft2
Annual Production 16,900
units
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,629 5,198,400
kWh
Electricity Demand $59,749 12,686
kW-mo/yr
Electricity Fees $1,030 -
Natural Gas $177,305 13,465
MMBtu
TOTAL YEARLY COSTS $543,713
RECOMMENDED SAVINGS* $132,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $264 - $39
662
kWh
- $225
-
MMBtu
02 2.6211: Conserve energy by efficient use of vending machines $80 $180 $80
1,361
kWh
- -
03 2.6218: Turn off equipment when not in use $5,021 - - - $5,021
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,039 $14,918 $4,056
68,748
kWh
$983
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $72,143 $531,930 $72,143
1,222,756
kWh
- -
06 2.6218: Turn off equipment when not in use $50,204 $14,000 $50,204
850,914
kWh
- -
TOTAL RECOMMENDED $132,751 $561,028 $126,522
2,144,441
kWh
$983
-
kW-mo/yr
$5,246
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs