ITAC Assessment: CC0010
ITAC logo
ITAC Assessment: CC0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 64,000
ft2
Annual Production 3,796,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $504,557 8,915,174
kWh
TOTAL YEARLY COSTS $504,557
RECOMMENDED SAVINGS* $210,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $25,016 $220,080 $25,016
438,876
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $33,524 $83,572 $33,524
588,146
kWh
-
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $151,984 $1,701,000 $251,104
4,405,334
kWh
$(-99,120.0)
04 2.6211: Conserve energy by efficient use of vending machines $78 $180 $78
1,361
kWh
-
TOTAL RECOMMENDED $210,602 $2,004,832 $309,722
5,433,717
kWh
$(-99,120.0)
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs