Assessment Year | 2022 |
---|---|
Principal Product | Soft Drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
500,000
ft2
|
Annual Production | 147,536
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $772,846 | 20,917,069 |
kWh
|
$0.037 |
Electricity Demand | $400,318 | 39,118 |
kW-mo/yr
|
$10.23 |
Electricity Fees | $2,193 | - |
|
- |
Natural Gas | $414,186 | 58,457 |
MMBtu
|
$7.09 |
TOTAL YEARLY COSTS | $1,589,543 | |||
RECOMMENDED SAVINGS* | $215,855 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,632 | $1,975 |
$3,359
90,782
kWh
|
$1,273
-
kW-mo/yr
|
- | |
02 | 2.1392: Replace purchased steam with other energy source | $53,990 | $140,000 | - | - |
$53,990
-
MMBtu
|
|
03 | 2.6242: Minimize operation of equipment maintained in standby condition | $111,035 | $52,000 |
$80,517
2,176,123
kWh
|
$30,518
-
kW-mo/yr
|
- | |
04 | 2.2611: Moderate cooling tower outlet temperature | $3,081 | - |
$3,081
83,277
kWh
|
- | - | |
05 | 2.1221: Replace obsolete burners with more efficient ones | $29,148 | $60,000 | - | - |
$29,148
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $1,403 | $5,250 | - | - |
$1,403
-
MMBtu
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,938 | $50,000 |
$6,482
175,200
kWh
|
$2,456
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,628 | $3,444 |
$2,265
61,219
kWh
|
$1,363
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $215,855 | $312,669 |
$95,704
2,586,601
kWh
|
$35,610
-
kW-mo/yr
|
$84,541
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs