Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Packaging Tape
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $50
M
to 100
M
# of Employees 95
Plant Area 130,000
ft2
Annual Production 412
units
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $312,784 8,314,605
kWh
Electricity Demand $162,175 15,901
kW-mo/yr
Electricity Fees $2,624 -
Natural Gas $271,398 46,558
MMBtu
TOTAL YEARLY COSTS $748,981
RECOMMENDED SAVINGS* $54,897 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,092 $17,800 $4,104
108,006
kWh
$988
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,936 $4,400 $1,530
40,253
kWh
$406
-
kW-mo/yr
-
03 2.7226: Use computer programs to optimize hvac performance $364 - $364
9,574
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,805 $18,800 $4,972
130,865
kWh
$1,833
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,005 $1,000 $2,197
57,816
kWh
$808
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $3,056 $8,000 - - $3,056
-
MMBtu
07 2.2437: Recover waste heat from equipment $10,680 $40,000 $(-460.0)
(-12,102)
kWh
$(-169.0)
-
kW-mo/yr
$11,309
-
MMBtu
08 2.2612: Use cooling tower water instead of refrigeration $15,506 $58,000 $12,310
323,944
kWh
$3,196
-
kW-mo/yr
-
09 2.2135: Repair and eliminate steam leaks $8,453 $500 - - $8,453
-
MMBtu
TOTAL RECOMMENDED $54,897 $148,500 $25,017
658,356
kWh
$7,062
-
kW-mo/yr
$22,818
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs