Assessment Year | 2022 |
---|---|
Principal Product | Packaging Tape |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 95 |
Plant Area |
130,000
ft2
|
Annual Production | 412
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $312,784 | 8,314,605 |
kWh
|
$0.038 |
Electricity Demand | $162,175 | 15,901 |
kW-mo/yr
|
$10.20 |
Electricity Fees | $2,624 | - |
|
- |
Natural Gas | $271,398 | 46,558 |
MMBtu
|
$5.83 |
TOTAL YEARLY COSTS | $748,981 | |||
RECOMMENDED SAVINGS* | $54,897 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,092 | $17,800 |
$4,104
108,006
kWh
|
$988
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,936 | $4,400 |
$1,530
40,253
kWh
|
$406
-
kW-mo/yr
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $364 | - |
$364
9,574
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,805 | $18,800 |
$4,972
130,865
kWh
|
$1,833
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,005 | $1,000 |
$2,197
57,816
kWh
|
$808
-
kW-mo/yr
|
- | |
06 | 2.2511: Insulate bare equipment | $3,056 | $8,000 | - | - |
$3,056
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $10,680 | $40,000 |
$(-460.0)
(-12,102)
kWh
|
$(-169.0)
-
kW-mo/yr
|
$11,309
-
MMBtu
|
|
08 | 2.2612: Use cooling tower water instead of refrigeration | $15,506 | $58,000 |
$12,310
323,944
kWh
|
$3,196
-
kW-mo/yr
|
- | |
09 | 2.2135: Repair and eliminate steam leaks | $8,453 | $500 | - | - |
$8,453
-
MMBtu
|
|
TOTAL RECOMMENDED | $54,897 | $148,500 |
$25,017
658,356
kWh
|
$7,062
-
kW-mo/yr
|
$22,818
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs