ITAC Assessment: CC0006
ITAC logo
ITAC Assessment: CC0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 232,850
ft2
Annual Production 48,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $537,042 11,207,857
kWh
Electricity Demand $262,623 21,771
kW-mo/yr
Electricity Fees $(-79,159.0) -
Natural Gas $537,113 74,676
MMBtu
TOTAL YEARLY COSTS $1,257,619
RECOMMENDED SAVINGS* $123,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $12,027 $5,000 $8,560
178,347
kWh
$3,467
-
kW-mo/yr
-
02 2.2314: Replace heat treating oven with more efficient unit $18,077 $60,000 - - $18,077
-
MMBtu
03 2.2425: Use flue gases to heat process or service water $51,588 $175,000 - - $51,588
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $20,854 $13,360 $16,160
336,664
kWh
$4,694
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $20,461 $10,000 $15,221
317,112
kWh
$5,240
-
kW-mo/yr
-
TOTAL RECOMMENDED $123,007 $263,360 $39,941
832,123
kWh
$13,401
-
kW-mo/yr
$69,665
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs