Assessment Year | 2022 |
---|---|
Principal Product | Bread |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 26,500
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $255,049 | 7,116,862 |
kWh
|
$0.036 |
Electricity Demand | $136,776 | 12,314 |
kW-mo/yr
|
$11.11 |
Electricity Fees | $704 | - |
|
- |
Natural Gas | $345,828 | 48,770 |
MMBtu
|
$7.09 |
TOTAL YEARLY COSTS | $738,357 | |||
RECOMMENDED SAVINGS* | $74,614 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,985 | $26,500 |
$7,542
209,511
kWh
|
$3,443
-
kW-mo/yr
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,273 | $1,000 |
$1,273
35,354
kWh
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $2,217 | - |
$2,217
61,589
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,997 | $6,000 |
$5,620
156,108
kWh
|
$2,377
-
kW-mo/yr
|
- | |
05 | 2.6242: Minimize operation of equipment maintained in standby condition | $4,973 | $1,500 |
$2,547
70,761
kWh
|
$2,426
-
kW-mo/yr
|
- | |
06 | 2.2314: Replace heat treating oven with more efficient unit | $10,225 | $30,000 | - | - |
$10,225
-
MMBtu
|
|
07 | 2.2425: Use flue gases to heat process or service water | $36,944 | $110,000 | - | - |
$36,944
-
MMBtu
|
|
TOTAL RECOMMENDED | $74,614 | $175,000 |
$19,199
533,323
kWh
|
$8,246
-
kW-mo/yr
|
$47,169
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs