ITAC Assessment: CC0005
ITAC logo
ITAC Assessment: CC0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 26,500
ton
Production Hrs. Annual 7,488
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $255,049 7,116,862
kWh
Electricity Demand $136,776 12,314
kW-mo/yr
Electricity Fees $704 -
Natural Gas $345,828 48,770
MMBtu
TOTAL YEARLY COSTS $738,357
RECOMMENDED SAVINGS* $74,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,985 $26,500 $7,542
209,511
kWh
$3,443
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,273 $1,000 $1,273
35,354
kWh
- -
03 2.6218: Turn off equipment when not in use $2,217 - $2,217
61,589
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,997 $6,000 $5,620
156,108
kWh
$2,377
-
kW-mo/yr
-
05 2.6242: Minimize operation of equipment maintained in standby condition $4,973 $1,500 $2,547
70,761
kWh
$2,426
-
kW-mo/yr
-
06 2.2314: Replace heat treating oven with more efficient unit $10,225 $30,000 - - $10,225
-
MMBtu
07 2.2425: Use flue gases to heat process or service water $36,944 $110,000 - - $36,944
-
MMBtu
TOTAL RECOMMENDED $74,614 $175,000 $19,199
533,323
kWh
$8,246
-
kW-mo/yr
$47,169
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs