ITAC Assessment: BS0145
ITAC logo
ITAC Assessment: BS0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Dimensional Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 79
Plant Area 2,178,000
ft2
Annual Production 250,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,448,477 25,277,909
kWh
Electricity Demand $247,731 51,946
kW-mo/yr
TOTAL YEARLY COSTS $1,696,208
RECOMMENDED SAVINGS* $82,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,842 $306 $7,564
132,000
kWh
$1,278
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $2,250 $6,500 $1,227
21,420
kWh
$1,022
-
kW-mo/yr
-
03 3.4131: Minimize contamination of water before treatment $46,312 $106,140 - - $46,312
04 2.2113: Repair or replace steam traps $22,793 $7,115 - - $22,793
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,246 $3,700 $1,330
23,220
kWh
$916
-
kW-mo/yr
-
TOTAL RECOMMENDED $82,443 $123,761 $10,121
176,640
kWh
$3,216
-
kW-mo/yr
$69,105
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs